logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
February 13, 2019

50 & 100 Boatswain’s Construction Update

50 & 100 Boatswain’s Way are undergoing some major transformations!

The arches are being framed for the barrel vault ceiling at 50 Boatswain’s Way, and the coffered ceiling structure is starting to take shape at 100 Boatswain’s Way.  Wainscot paneling is also being installed in the corridors of both buildings.  These design details are already giving us a preview of how different these spaces will feel once completed!

 

Lobby Before Construction at 50 Boatswain’s Way

 

Lobby Under Construction at 50 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Under Construction at 100 Boatswain’s Way

 

Related Posts

A Mass Timber & CLT Development

January 27, 2020

Construction Begins on One Newcomb Place

July 8, 2019

44 N Beacon has been approved by the BPDA

December 21, 2018

New East Boston Residential Project

January 10, 2020
  • Links

    • WORK
    • STUDIO
    • NEWS
    • CONTACT
  • Follow

    • Instagram
    • Facebook
    • Linkedin
  • Contact

    650 Columbus Ave, Suite A
    Boston, MA 02118
    617-606-4496
    info@mfds-bos.com
© 2020 Monte French Design Studio