logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
February 13, 2019

50 & 100 Boatswain’s Construction Update

50 & 100 Boatswain’s Way are undergoing some major transformations!

The arches are being framed for the barrel vault ceiling at 50 Boatswain’s Way, and the coffered ceiling structure is starting to take shape at 100 Boatswain’s Way.  Wainscot paneling is also being installed in the corridors of both buildings.  These design details are already giving us a preview of how different these spaces will feel once completed!

 

Lobby Before Construction at 50 Boatswain’s Way

 

Lobby Under Construction at 50 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Under Construction at 100 Boatswain’s Way

 

Related Posts

11 E Lenox Under Construction

October 12, 2021

Marketing Lookbook

May 20, 2019

44 N Beacon has been approved by the BPDA

December 21, 2018

Monomoy Residence Photoshoot Scouting

June 20, 2019
  • Links

    • WORK
    • STUDIO
    • NEWS
    • CONTACT
  • Follow

    • Instagram
    • Facebook
    • Linkedin
  • Contact

    179 South Street, 3rd Floor
    Boston, MA 02111
    info@mfds-bos.com
© 2026 Monte French Design Studio