logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
February 13, 2019

50 & 100 Boatswain’s Construction Update

50 & 100 Boatswain’s Way are undergoing some major transformations!

The arches are being framed for the barrel vault ceiling at 50 Boatswain’s Way, and the coffered ceiling structure is starting to take shape at 100 Boatswain’s Way.  Wainscot paneling is also being installed in the corridors of both buildings.  These design details are already giving us a preview of how different these spaces will feel once completed!

 

Lobby Before Construction at 50 Boatswain’s Way

 

Lobby Under Construction at 50 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Under Construction at 100 Boatswain’s Way

 

Related Posts

Monomoy Residence Skylight

December 13, 2018

Mass Timber Topped Out

December 22, 2021

Adaptive Reuse Sneak Peek

April 25, 2019

50 & 100 Boatswain’s Construction Underway

December 4, 2018
  • Links

    • WORK
    • STUDIO
    • NEWS
    • CONTACT
  • Follow

    • Instagram
    • Facebook
    • Linkedin
  • Contact

    179 South Street, 3rd Floor
    Boston, MA 02111
    info@mfds-bos.com
© 2025 Monte French Design Studio