logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
logo
  • WORK
  • STUDIO
  • NEWS
  • CONTACT
  • Home
  • Blog
  • renovation

Archives of #renovation

50 & 100 Boatswain’s Construction Complete

50 & 100 Boatswain’s Way Construction Complete!

The interior renovations at 50 & 100 Boatswain’s Way in Chelsea, MA are complete!  These lobbies are a shining example of how a few thoughtful design statements can completely transform a space, even when working within a tight budget. 

For this project we used ceiling details, flooring patterns, and new furniture layouts to create a sense of scale and definition.  Paired with fresh paint and updated light fixtures, these spaces are not only brighter and more inviting, but offer more functionality for the residents as well.    

50 Boatswain’s Way

 

100 Boatswain’s Way

3 years ago

Morris Island Residence featured on Dwell.com

Morris Island Residence is featured online at Dwell!

The article (link below, Dwell+ subscription required) elaborates on our design process and how we tackled the extensive renovation and additions to an existing home and site to create the ideal family retreat for our clients. Much thanks to our collaborators on the project, whose hard work and ingenuity made the project special. For more on the project, please visit our project page which is also listed below.

https://www.dwell.com/article/morris-island-residence-monte-french-design-studio-7e814d11

https://www.mfds-bos.com/project/morris-island-residence/ 

3 years ago

Adaptive Reuse Sneak Peek

A sneak peek into an exciting new project!

We can’t reveal the project just yet, but we can show you some existing conditions photos. It’s an adaptive reuse project to re-envision a dilapidated industrial building into a vibrant new typology…stay tuned!

 

4 years ago

Monomoy Residence Update

The Monomoy Residence is nearing completion!

The building is fully enclosed, and the finishes are well underway. Paint has started, and bathroom finishes are being installed. The wood floors will be laid later this month, just before the millwork is installed. The landscape that was planted last fall will start to grow in with the spring, and we’re looking forward to the project being complete come early spring!

Also, see Tradern Fine Woodworking’s Instagram post at the end for a sneak peek at our hidden ships ladder to the roof deck!

South elevation of the addition. The middle vertical band of temporary doors will be replaced with full height glazing once all finishes and fixtures have been delivered.

Second floor glass bridge looking south – the door at the end of the hallway is temporary and will be replaced with floor-to-ceiling glass for an uninterrupted view to the water.
Glass bridge to the second floor master suite, cutting through the existing house into new addition.
First floor master bedroom, looking out on a foggy day.

 

We’re very happy with the quality and attention to detail of our woodworker on the project, Tradern Fine Woodworking. Check out their Instagram for more of their great work.

View this post on Instagram

We have a ladder system in the works which will pull out of a wall of walnut cabinetry, giving access to a roof deck, fun project! . . . . #ladder #pullout #rollingladder #walnut #cabinetry #custom #woodworking #handmade #itsnoteasy #roofaccess

A post shared by Tradern Fine Woodworking (@tradern_fine_woodworking) on Feb 6, 2019 at 12:13pm PST

 

 

 

 

 

4 years ago

50 & 100 Boatswain’s Construction Update

50 & 100 Boatswain’s Way are undergoing some major transformations!

The arches are being framed for the barrel vault ceiling at 50 Boatswain’s Way, and the coffered ceiling structure is starting to take shape at 100 Boatswain’s Way.  Wainscot paneling is also being installed in the corridors of both buildings.  These design details are already giving us a preview of how different these spaces will feel once completed!

 

Lobby Before Construction at 50 Boatswain’s Way

 

Lobby Under Construction at 50 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Before Construction at 100 Boatswain’s Way

 

Lobby Under Construction at 100 Boatswain’s Way

 

4 years ago

50 & 100 Boatswain’s Construction Underway

Construction has begun at 50 & 100 Boatswain’s Way!

We are excited to announce that construction is officially underway at 50 & 100 Boatswain’s Way in Chelsea, MA.  This project consists of renovations at two condominium buildings, including full lobby and corridor interiors.  Once completed, both buildings will work together to achieve a cohesive overall design scheme while still maintaining their own unique identities.

 

Proposed lobby design at 50 Boatswain’s Way.
Proposed lobby design at 50 Boatswain’s Way.

Proposed lobby design at 100 Boatswain’s Way.
Proposed second floor lounge design overlooking lobby at 100 Boatswain’s Way. 
4 years ago
  • Links

    • WORK
    • STUDIO
    • NEWS
    • CONTACT
  • Follow

    • Instagram
    • Facebook
    • Linkedin
  • Contact

    650 Columbus Ave, Suite A
    Boston, MA 02118
    617-606-4496
    info@mfds-bos.com
© 2020 Monte French Design Studio